Recent Projects

Breasting Dolphin Timber Replacement / Port Of Bellingham-Alaska Ferry Terminal

Posted on February 7, 2013

Neptune Marine replaced timbers on the Ferry Terminal Breasting Dolphins for BMI/Port of Bellingham.

Port Of Everett Floatation Upgrades

Posted on February 1, 2013

Neptune Marine Installed 440- 575lb. rotomold floatation billits under 2 concrete docks at the marina. The dock systerm was raised,leveled and all the hardware was tightened.

Port Of Everett Fender Pile Replacement

Posted on February 1, 2013

Neptune Marine replaced multiple steel fender piles and performed misc. pier repairs for the port.

Port of South Whidbey – Langley Boat Ramp Improvements

Posted on December 31, 2012

Neptune Marine custom built a new timber dock, installed 4 new steel pile and a mantle gangway. On-site work was completed in 5 days.

Washington State Department of Natural Resources, Shaw Island, WA

Posted on December 31, 2012

Washington State Department of Natural Resources contracted Neptune to remove 20 ton of derelict cresote logs from a beach on Shaw Island WA. Neptune Marine utilized a small 20×40 barge, excavator and the workboat “Meridian” to remove the logs.

US Coast Guard Aid To Navigation, Belle Rock

Posted on July 11, 2012

A marine transportation company hit the aid to navigation on Belle Rock in Rosario Strait. Neptune Marine was hired to remove the rubble of the old tower and build a new tower. Neptune Marine utilized a 98′ landing craft and … Continue reading

Port of Port Angeles Emergency Piling Repairs

Posted on June 4, 2012

Neptune Marine performed emergency piling repairs on two breasting dolphins and replaced several steel fender piling on a pier for the port.

Lopez Island Ferry Terminal – Diving Support

Posted on May 21, 2012

Neptune Marine provided a commercial dive team to assist Razz Construction on the Lopez Island Ferry Terminal Floating Wingwall Rehabilitation project. Neptune Marine Completed the sub-sea portions of the project including a new cathodic protection system, and installation of new … Continue reading

Anchor Cove Marina Breakwater Replacement

Posted on January 4, 2012

Neptune Marine has started the first phase of a new breakwater for Anchor Cove Marina. 100 ft of old timber breakwater was removed and disposed of. A new fixed steel and concrete breakwater was installed in its place. The breakwater … Continue reading

Port of Port Angeles – Terminal 3 Fender Pile Replacement

Posted on October 28, 2011

Neptune Marine replaced 18 steel piling and over 500 LF of whaler and chock on the pier at terminal 3.